How Much Does an ADU Cost in San Diego? What Sets the Price
Garage conversion, attached, detached: three routes with very different amounts of new building. What published figures show, what moves the number, and what an estimate should show.
The three routes
There are three routes to an accessory dwelling unit, and they price very differently because they involve very different amounts of new construction.
A garage conversion is cheapest because the slab, three or four walls and the roof already exist. You are paying to make an existing shell habitable. A detached unit is the most expensive because you are paying for a complete small building: foundation, framing, envelope, roof, utilities run across the property, and its own everything.
What published San Diego figures show
| What was priced | Published figure |
|---|---|
| New detached ADUs in a San Diego pilot, 224 to 1,199 sq ft (San Diego Housing Commission, 2021, hard and soft costs) | $116,803 to $342,078 |
| A 660 sq ft detached ADU, Los Angeles (Cost vs. Value 2025) | $178,536 |
| Median ADU cost, Orange and San Diego Counties (UC Berkeley survey, 2020) | $130,000 |
| Median garage-conversion ADU, statewide (UC Berkeley survey, 2020) | $90,000 |
Published figures, not Construction Crafters prices. Each line names its source and year; the older surveys predate recent cost increases. Your project is priced only after a site visit.
What actually moves the number
- Utilities. How far the new unit sits from the existing electrical panel, sewer line and water supply. Trenching across a property is real money, and a panel upgrade is common when you add a second dwelling.
- Site conditions. Slope, access for machinery, soil, and whether a truck can get to the back of the lot at all. A tight lot with hand-dug footings costs more than an open one.
- Foundation type. A flat pad and a simple slab is the cheap case. Stem walls, piers or anything engineered for slope pushes it up.
- Bathroom and kitchen count. Every wet room adds plumbing, waterproofing, ventilation and inspection.
- Design and permitting complexity. Coastal zones, hillside overlays and historic districts all add review time and drawing work before anyone builds anything.
Garage conversion: the cheapest route, with conditions
If you already have a garage, converting it is almost always the lowest-cost path to a legal unit. But a garage is not a room yet, and the work to change that is not cosmetic.
- Ceiling height has to meet the minimum for habitable rooms, which some older garages do not.
- The roll-up door opening becomes a wall, so a window or door has to replace it for light and egress.
- Slab, walls and roof all get insulated and detailed for moisture.
- New circuits, proper lighting, heating and ventilation get added to code.
None of that is exotic, but it is why a conversion is a construction project rather than a decorating one.
What your estimate should look like
The single most useful thing you can do when comparing contractors is refuse to accept one number. A real estimate is a line-item document with allowances, so you can see what is assumed and where the risk sits. If a bid is a single figure on one page, you cannot tell whether it is cheap or simply incomplete, and the difference will surface later as a change order.
Ask for the allowance amounts specifically. Allowances are the placeholders for things not yet selected, like tile or fixtures. A bid can be made to look cheaper simply by setting those allowances unrealistically low.
Before you call anyone
Three pieces of information make a first conversation far more productive: roughly what size unit you want, whether it is for family or for rent, and whether you have a garage or a clear piece of yard to build on. With those three answers a contractor can tell you which of the three routes fits, before anyone walks the property.
Quick answers
Is a garage conversion always cheaper than a detached ADU?
In almost every case, yes, because the slab, walls and roof already exist. The exception is a garage in poor condition or with a ceiling too low for habitable rooms, where the corrective work can close the gap.
Do I need a permit for an ADU in San Diego?
Yes. An accessory dwelling unit is a permitted structure, and the drawings and approvals are part of the project.
How long does an ADU take to build?
Timelines depend on the route and on review times, which is why we set the schedule at the estimate stage rather than promising a number in advance.
Sources
- Accessory Dwelling Unit Pilot Program: Lessons Learned for San Diego Homeowners (San Diego Housing Commission)
- Cost vs. Value 2025: Los Angeles (Pacific region) (JLC (Journal of Light Construction), Cost vs. Value 2025)
- Accessory Dwelling Unit (project definition) (JLC)
- Implementing the Backyard Revolution: Perspectives of California's ADU Owners (UC Berkeley Center for Community Innovation)
Read on 2026-10-16. These are published figures, not Construction Crafters prices.