From fresh floors to a house rebuilt on its frame

Whole-house remodeling in San Diego

"Full home remodel" covers a lot of ground. On our jobs it has meant anything from new floors and fresh paint through a house, to a house opened to its framing and closed up again with new sheathing, wrap, stucco, drywall and a new fireplace surround.

Construction Crafters Inc. (CSLB #1106596, B General Building) sorts that range into the depths below. Knowing which one you need is the first thing an estimate should settle, because the depth decides the permits, whether you can stay in the house during the work, and what the budget has to cover.

Petar Gacic's own list of trades starts with remodeling, followed by drywall, painting, flooring, tile, framing, bathrooms, kitchens, windows and doors. A whole-house job usually uses most of them.

Four depths of remodel

Four depths of remodel

01

Surface

What changes
Floors, paint, trim and fixtures.
What stays
Walls, layout, and the plumbing and wiring where they are.
Permits
Finish work alone often needs few or none; check with your city.
Living at home
Usually, moving room to room as the work moves.
On one of our jobs
Vinyl plank over a concrete slab with a moisture sheet under it, and the walls repainted gray.
Room finished with gray wood-look vinyl plank and fresh gray walls
02

Rooms

What changes
Kitchens and bathrooms rebuilt, floors replaced across several rooms, ceilings repaired.
What stays
The shell of the house and most walls.
Permits
Usually needed for plumbing and electrical work.
Living at home
Often, with a plan for the rooms you lose for a while.
On one of our jobs
The old hard floor up, the floor leveled and light wood-look plank laid across the landing and hall and into two bathrooms. Another house had its kitchen and a bathroom torn out and a new gray shaker kitchen built; a third got a barn door, new floors, repaired ceilings and a bathroom refresh.
Upstairs landing with new light wood-look flooring running into the bedroom
03

Shell

What changes
The interior opened to the studs, framing changed, new sheathing, house wrap and stucco outside, and new drywall inside.
What stays
The foundation and the frame that is sound.
Permits
Yes: structural and exterior work, plumbing and electrical.
Living at home
No. The house is a building site.
On one of our jobs
The rooms taken to bare framing, OSB sheathing and wrap outside, a stucco base coat, new drywall and a new fireplace surround.
Old wall framing with a let-in diagonal brace, exposed during a whole-house remodel
The same house, then and now

The same house, then and now

The house that went down to its framing, photographed during and after.

Outside, the same wall

New OSB sheathing on the walls, then the stucco coat over it.

House exterior re-sheathed with new OSB panels during a whole-house remodel
Then
House after the new stucco went on, windows still masked and the deck railing in place
Now

Inside

Rooms open to the studs; later, new drywall and a fireplace surround.

House interior gutted to the studs during a whole-house remodel, walls opened from end to end
Then
Living room with new drywall and a fireplace surround, floor protected before the final finishes
Now
Four questions that set the depth

Four questions that set the depth

Answer these before the first visit and the estimate starts in the right place.

Are walls, doors or the kitchen and bathroom layouts moving?

If yes
At least the rooms depth. If a wall that carries load moves, the shell depth.
Depth
Rooms or Shell

Is anything failing behind the finishes: soft floors, water stains, cracked stucco, old wiring?

If yes
Mention it at the consultation. The scope follows what the house shows once it is opened.
Depth
Rooms or Shell

Is the outside part of the job: sheathing, stucco, roof?

If yes
The shell depth, with the permits that come with it.
Depth
Shell

Do you need to live in the house during the work?

If yes
Plan the job room by room at the surface or rooms depth; a shell job means moving out.
Depth
Surface or Rooms
How a whole-house job starts

How a whole-house job starts

The way Construction Crafters describes its own process:

  1. Free consultationWe listen to what you need the house to do.
  2. Site visitWe come to the house and see it in person.
  3. Project assessmentWe work out the depth of the job and what it involves.
  4. Detailed proposalYou get a proposal with a timeline and a budget.

Once you approve the proposal, the work is scheduled. Our guide to reading a construction estimate shows what a good proposal should spell out.

Questions

Questions people ask

A

What counts as a whole-house remodel?

Anything from new floors and paint through most of a house to a house opened to its framing and rebuilt. We sort it into four depths: surface, rooms, shell and rebuild. The deeper the job, the more permits it needs and the less of the house you can use during the work.

B

Can we live in the house during a whole-house remodel?

At the surface depth, usually, moving from room to room. When kitchens and bathrooms are rebuilt, often, with a plan for the rooms you lose. When the house is opened to the studs or rebuilt, no. Our guide to living at home during a remodel goes into detail.

C

Does a whole-house remodel need permits?

Most do. Structural changes, a new roof, and new plumbing or electrical work need permits; finish work alone may not. Your city's building department, or the County for unincorporated areas, decides for your address.

D

How is a whole-house remodel priced?

After a free consultation, a site visit and a project assessment, you get a detailed proposal with a timeline and a budget. We do not publish whole-house prices, because the depth of the job changes everything.

E

Can a remodel include a new roof?